This project was a bathroom renovation started and completed in April 2017. The client contacted us because their bathrooms were rundown and in desperate need of repair.

The walls in the shower were water damaged, so they weren’t actually using the shower any longer. We solved this issue and much more.

We put a new design in place with all new fixtures, flooring, and tiles. After receiving the green light, we went in and stripped the space, renovated it, and made it look and function beautifully.

Full batrhroom shot

WHAT FIXTURES DID WE USE?

Like most of our renovations, we used Reece for the bathroom products, including:

  • Mizu Drift wall bath mixer for the bath and basin
  • Mizu Drift mixer for the shower
  • Phoenix Gen X heated towel rail
  • Kado freestanding bath
  • Posh Solus MKII shower rails
  • Forma back-to-wall toilet seat

Meanwhile, for the tiling we used:

  • 300 x 600 rectified Cordoba dark grey floor tiles
  • 300 x 600 rectified matte white wall tiles

We like to use this colour combination for many of our projects, and our clients were thrilled with the outcome.

We also installed a Dominque MKII wall cabinet to finish the look.

To bring in more light and airflow, we also added a big Queenslander galley-style window.

After that, we painted the space to finish it off and complete the renovation. We basically redid the entire space not only to meet but exceed our clients’ needs.

Bath basin taps
Mirror sink cabinet

PROJECT TIMELINE

The project took about a month from start to finish. Here’s how it went:

  • Met with clients and put together a plan
  • The pre-ordered window from New Look Windows.
  • Spent a day performing demolition and stripping the space
  • Let the surface water damage dry out for a couple of days
  • Accessed the water damage and cut the slab to move the drains around
  • Spent two days roughing the pipes into the walls
  • The electrician ran all new switches and power points
  • Tilers scraped and re-tiled the floors and walls.
  • Installed the cabinet, stone, and glass shower screen
  • Finished installing the tapware
  • Repainted the space
  • Cleaned up and voila…the project was finished!

THE END RESULT

Thanks to our experience and excellent communication with the client, the entire process went smoothly and according to plan. In the end, she was thrilled with the result and pleasantly surprised in our ability to complete the project on time.

Since redoing the bathroom in her Alexander St home, she’s referred us to several other clients, and we have a great relationship to this day!

Tall bathroom shot

VIEW OTHER PROJECTS

FULL HOUSE RENOVATION IN MOUNT HAWTHORN

We embarked on an ambitious renovation project at Mount Hawthorn.

Bayswater Kitchen Bathroom & Living Area Renovation

The client contacted us because their bathrooms were rundown and in desperate need of repair.

Birdwood Circus Bicton Bathroom

We began renovations on the bath and laundry area of this wonderful home built in the early 1900s in November.

SEE WHAT OUR CUSTOMERS ARE SAYING

  • 5 star review  Very satisfied customer! Stewart and the team at Perth Renovations Co did a super job with our kids bathroom. It was an old 1960's bathroom and the room was completely... read more

    thumb Selena Collier
    August 9, 2020
  • 5 star review  Stewart and his team did an awesome job turning an old bedroom into a top quality bathroom. We couldn't be more happier with the outcome. I highly recommend Stewart and... read more

    thumb MIKE LANE
    August 6, 2020

CALL US TODAY FOR BATHROOM RENOVATIONS

Google Rating
4.8
Based on 12 reviews